Coming soon: Windpark Koral Tabak

Aqualectra and NuCapital have been working together for some time. NuCapital currently operates the three wind farms located at Playa Canoa and Tera Korá. The three parks jointly have a possible power production of 67.45 MW.

NuCapital redeveloped the existing wind farms located at Playa Kanoa and Tera Kórá with Vestas 3.0 MW V-90 turbines

The two companies have recently signed a PowerPurchase Agreement (PPA) with the aim of expanding power production with an increase of 21 MW through wind energy.
 
The increase in capacity contributes to strengthening Aqualectra's capacity offering so that the population remains assured of electricity. Increasing capacity through wind energy is part of the Curaçao energy transition in which Aqualectra has a leading role. During the signing of the energy purchase agreement (PowerPurchase Agreement), both the management of Aqualectra and NuCapital underlined the mutual trust and good cooperation between the two companies. The wind farm will be located in Koral Tabak. 
Coming soon: Windpark Koral Tabak
Watch the video

Aqualectra and NuCapital have been working together for some time. NuCapital currently operates the three wind farms located at Playa Canoa and Tera Korá. The three parks jointly have a possible power production of 67.45 MW.

NuCapital redeveloped the existing wind farms located at Playa Kanoa and Tera Kórá with Vestas 3.0 MW V-90 turbines

The two companies have recently signed a PowerPurchase Agreement (PPA) with the aim of expanding power production with an increase of 21 MW through wind energy.
 
The increase in capacity contributes to strengthening Aqualectra's capacity offering so that the population remains assured of electricity. Increasing capacity through wind energy is part of the Curaçao energy transition in which Aqualectra has a leading role. During the signing of the energy purchase agreement (PowerPurchase Agreement), both the management of Aqualectra and NuCapital underlined the mutual trust and good cooperation between the two companies. The wind farm will be located in Koral Tabak. 
Back To Top