NuCapital NuCapital NuCapital NuCapital Clean Energy!
  • Our Story
    • Our Company
  • Projects
  • Opportunities
    • BOOT for Communities
    • Investment Opportunities
    • NuPartner Opportunities
    • Site Suitability Studies
    • NuFrontiers
  • Our Team
  • Press and Media
    • News
    • Windpower Monthly
  • Contact Us
    • Roy M. Kolader
    • Hurdle H. "Trip" Lea III

Sidebar

Global Warming Is the Greatest Threat to Our World Today.

 

logo.jpg
Playa Kanoa
Tera Kórá
Tera Kórá III
Vader Piet
Colombia
Honduras

Projects

Tera Kórá III (Curaçao)

Details
Empty
  •  Print 
  • Email

WILLEMSTAD, Curaçao –  July 28, 2017, the new  Tera Kòrá III wind farm was inaugurated. the newly operational windfarm has a total installed capacity of 17.25 MW, bringing the total in Curaçao to 47.25 MW.

 The importance of this expanded project is reflected by the fact that, when combined with the existing wind farms, Curacao joins the world leaders in clean, sustainable energy; the island now sources greater than 40% of its annual demand from wind alone, along with its neighbor Aruba as the Caribbean leaders for clean energy.

From the early 1990’s Curaçao sourced clean energy from a total of 30 smaller wind turbines which were replaced in 2012 with 10 larger, state-of-the-art wind turbines. The 5 new turbines which were commissioned are Vestas V-117 3.45 MW turbines and will generate 65% of the energy originally generated from the 10 V90. Each turbine reaches a hub height of 91 meters from the ground, which three blades of 57 meters each. The wind turbines are built by the Danish company VESTAS and the civil works for the new wind farm were provided by CWM while the company MESC was responsible for the electrical infrastructure.

 

Photo gallery "Building Wind Farm Tera Kora III"

 

  • Click to enlarge image 01.jpg
  • Click to enlarge image 02.jpg
  • Click to enlarge image 03.jpg
  • Click to enlarge image 04.jpg
  • Click to enlarge image 05.jpg
  • Click to enlarge image 06.jpg
  • Click to enlarge image 07.jpg
  • Click to enlarge image 08.jpg
  • Click to enlarge image 09.jpg
  • Click to enlarge image 10.jpg
  • Click to enlarge image 11.jpg
  • Click to enlarge image 12.jpg
  • Click to enlarge image 13.jpg
  • Click to enlarge image 14.jpg
  • Click to enlarge image 15.jpg
  • Click to enlarge image 16.jpg
  • Click to enlarge image 17.jpg
  • Click to enlarge image 18.jpg
  • Click to enlarge image 19.jpg
  • Click to enlarge image 20.jpg
  • Click to enlarge image 21.jpg
  • Click to enlarge image 22.jpg
  • Click to enlarge image 23.jpg
  • Click to enlarge image 24.jpg
  • Click to enlarge image 25.jpg
  • Click to enlarge image 26.jpg
  • Click to enlarge image 27.jpg
  • Click to enlarge image 28.jpg
  • Click to enlarge image 29.jpg
  • Click to enlarge image 30.jpg
  •  


  • Prev
  • Next
  1. You are here:  
  2. Home
  3. Projects
  4. Tera Kórá III (Curaçao)

Copyright © 2023 NuCapital Inc.. All Rights Reserved. Powered by I.S.E.™ Information Systems Engineers