The Jouktai-Gen wind farm Project is a 20 MW project, located in La Guajira Peninsula, near Puerto Bolivar. The project will be the first to deploy modern wind turbines in Colombia. The project was developed by Jouktai-Gen in a collaboration between NuCapital Inc. and Acquire/WAYUU ESP.

NuCuraçao Windparken – NuCapital redeveloped the existing wind farm Playa Kanoa after purchasing the Caribbean’s premier operating wind farm, Delta Windparken located at Playa Kanoa. The installed capacity was 9 MW and repowering of the earlier park has been completed with the commissioning of 15MW of installed capacity utilizing Vestas 3.0 MW V-90 turbines.