• NuCuraçao Windparken – NuCapital redeveloped the existing wind farm Playa Kanoa after purchasing the Caribbean’s premier operating wind farm, Delta Windparken located at Playa Kanoa.
  • The installed capacity was 9 MW and repowering of the earlier park has been completed with the commissioning of 15MW of installed capacity utilizing Vestas 3.0 MW V-90 turbines.

 

Back To Top